Veličina
66 m²
Parcela
8.000 m²
Br. soba
3
Br. spavaćih soba
3
Br. kupatila
1
Opis
Otok Krk. Uvala Soline. Apartman u prizemlju novogradnje s okućnicom, 700m. od mora.
Apartman u prizemlju stambene površine 66 m2, sastoji se od : tri spavaće sobe, dnevni boravak s kuhinjom sa blagovaonicom, hodnik, kupaonica, terasa s izlazom na okućnicu površine cca 80 m2.
Kvalitetna gradnja, klima uredaj, PVC stolarija sa komarnicima. Kvalitetna talijanska keramika, te kupaonsko sanitarna oprema.
Parkirno mjesto površine 12,5 m2.
PDV u cijeni.
Apartman se prodaje po sistemu „ključ u ruke“
Planirani završetak radova 06/2024.
Apartman u prizemlju stambene površine 66 m2, sastoji se od : tri spavaće sobe, dnevni boravak s kuhinjom sa blagovaonicom, hodnik, kupaonica, terasa s izlazom na okućnicu površine cca 80 m2.
Kvalitetna gradnja, klima uredaj, PVC stolarija sa komarnicima. Kvalitetna talijanska keramika, te kupaonsko sanitarna oprema.
Parkirno mjesto površine 12,5 m2.
PDV u cijeni.
Apartman se prodaje po sistemu „ključ u ruke“
Planirani završetak radova 06/2024.
Krk island. Soline bay. Ground floor apartment with yard in a new building, 700 meters close to sea.
Apartment has 66 m2 of living space, consists of: three bedrooms, living room with kitchen and dining place, hallway, bathroom, terrace with access to the garden of approx. 80 m2.
Quality construction, air conditioning sys, PVC joinery with mosquito nets. Quality Italian ceramics and bathroom sanitary equipment.
Parking space of 12.5 m2.
VAT included in price.
The apartment is sold according to the "turnkey" system.
Planned completion of works 06/2024.
Apartment has 66 m2 of living space, consists of: three bedrooms, living room with kitchen and dining place, hallway, bathroom, terrace with access to the garden of approx. 80 m2.
Quality construction, air conditioning sys, PVC joinery with mosquito nets. Quality Italian ceramics and bathroom sanitary equipment.
Parking space of 12.5 m2.
VAT included in price.
The apartment is sold according to the "turnkey" system.
Planned completion of works 06/2024.